About Hot Dip galvanized/ Powder coating machine
1 Technical Specifications 1 Machine Structure Hot Dip Galvanized Powder Coating 2 Wash Bay Dimensions LWH 28 m 7 m 9 m 3 Number of Spray Nozzles 130 side bottom 4 Water Consumption 200300 liters per vehicle 5 Washing Time 35 minutes per truck 6 Capacity 1220 Trucks per Hour depending on soildirt load 7 Load Capacity 1500080000 kg 8 Water Pressure 2025 bar each nozzle 9 Pump Type Power High Pressure Vertical Pump 30 HP 2 sets 10 Water Tank Capacity 5000 Liters operational tank 11 Concrete Recycling Tank 40 cum 2 chambers for sludge settlement and water reuse 12 Control System Auto Manual with Contactor Logic Programming 13 Electrical Supply 415 V 50 Hz 3 Phase Neutral Earthing 14 Additional Systems Oil Skimmer Flocculent Dosing Pump Submersible Sludge Pumps 2 nos Control Panel 2 Scope of Supply Work Supply of complete equipment set as above Installation testing and commissioning at site Design and engineering as per ISASTMBIS standards Safety compliance labour welfare norms PF ESI PMJJBY PMSBY Operator training at site after installation 3 Commercials Equipment Cost 1000000 Rupees Ten Lakhs Only Civil Work Approx 400000 Rupees Four Lakhs Only GST 18 extra as applicable Validity of Quotation 30 days from the date of issue 4 Payment Terms Stage 1 10 after designdrawing approval Stage 2 40 after supply acceptance at site Stage 3 50 after successful installation commissioning Safety Retention 2 of billed value released quarterly on safety compliance 5 Warranty Support Defect Liability 12 months from commissioning 247 Customer Support PanIndia service network with trained operator support We trust our offer meets your requirement Please feel free to contact us for any clarification We look forward to your valued order and assure you of our best service at all times With Best Regards For JOSS JD SERVICE Authorized Signatory Name _____________________ Designation _____________________
FAQs of Hot Dip galvanized/ Powder coating machine:
Q: What is the working voltage requirement for the Hot Dip Galvanized/Powder Coating Machine?
A: The working voltage requirement is 415 V, 50 Hz, 3 Phase + Neutral + Earthing.
Q: What is the warranty period for the Hot Dip Galvanized/Powder Coating Machine?
A: The warranty period is one year from the date of billing.
Q: What are the dimensions of the Hot Dip Galvanized/Powder Coating Machine?
A: The machine has dimensions of 2.8m*7m*9m (millimeters).
Q: What is the power source for the Hot Dip Galvanized/Powder Coating Machine?
A: The machine operates on an electric power source.
Q: What is the lowering time for the Hot Dip Galvanized/Powder Coating Machine?
A: The lowering time is 3 minutes.